Pre-Start Checklists in NZ: Why Every Machine Needs One (and How to Go Digital)

When a machine hurts someone, the first document WorkSafe asks for is the pre-start inspection record. If your answer is a soggy carbon-copy book in the cab — or nothing — you have a problem. Here's how pre-starts should work on a modern NZ civil site.

What the law expects

The HSWA requires PCBUs to ensure plant is safe and maintained. A documented daily pre-start is the accepted evidence that you're doing that. It's also standard prequalification for working under major contractors and councils.

What a digger pre-start should cover

  • Fluids: engine oil, hydraulic oil, coolant, fuel
  • Tracks / tyres, pins and bushes, attachments secure
  • ROPS/FOPS, seatbelt, mirrors, cameras
  • Lights, beacon, horn and reversing alarm
  • Leaks, damage and anything different from yesterday
  • Hour-meter reading — this feeds servicing schedules

Why paper pre-start books fail

  • They live in the cab and get lost with the machine
  • Nobody in the office sees a fault until the machine breaks
  • No timestamps — a book can be filled in a week later
  • Faults don't create actions, they create paperwork

Digital pre-starts in Fieldlink

The operator opens the app, picks the machine by rego, runs the checklist in under two minutes and photographs any faults. A failed item alerts the office instantly, the hour-meter reading updates service-due tracking, and every inspection is stored against the machine forever — timestamped and tamper-proof.

One near-miss investigation goes smoothly, and the system has paid for itself. Try Fieldlink's pre-start checklist app free for 30 days.